Licensing

Electrician Licensing in Utah

Utah licenses electricians statewide. The journeyman-level credential is the Journeyman Electrician License, issued by the Utah Department of Commerce — Division of Professional Licensing. It requires at least 8,000 hours of experience.

Source: Utah State Legislature (Utah Code 58-55-301), checked 2026-10-07

Before you start: You need this state credential before you start electrical work in Utah.

Credential
Apprentice Electrician license
Issued by
Utah Division of Professional Licensing
Fee
Not confirmed in our records.
How to apply
The application needs a Verification of Supervision form completed and signed by your employer.

Official source · Checked 2026-10-07

Page last reviewed 2026-09-15 against official sources. Confirm with the issuing authority before applying.

Licensed in another state? See reviewed routes into Utah.

How electrical licensing works in Utah

Utah’s Division of Professional Licensing (DOPL) issues five individual electrician licenses: Apprentice, Journeyman, Master, Residential Journeyman and Residential Master. Each has a distinct scope and qualification route. Electrical contracting uses separate E200 General Electrical and E201 Residential Electrical business classifications.

Choose the credential for the work you will perform and the role you will hold. An individual electrician license does not by itself license a contracting business. E200 requires a master electrician; E201 accepts a master electrician or residential master electrician. A business entity names a qualified individual who exercises material authority in its contracting operations.

Credential-specific requirements

Requirements differ by credential. Expand any credential for the work or business activity you plan to perform. Issued by Utah Department of Commerce — Division of Professional Licensing unless noted.

Apprentice Electrician License License
Issuing authority
Utah Department of Commerce — Division of Professional Licensing →
Scope of work
Learn and perform electrical work under an appropriately licensed master, journeyman, residential master or residential journeyman. Nonresidential immediate supervision requires the supervisor on the same project or jobsite, without continuous line of sight; residential supervision permits an off-site supervisor available for direction, oversight, inspection and evaluation. The ordinary ratio is two apprentices per supervisor on nonresidential projects and three on residential projects. Beginning in the fourth training year, the statute permits up to eight hours without supervision in a 24-hour period. This is not independent contracting authority.
Experience or qualification
Submit the employer-signed Verification of Supervision form identifying the contractor, licensed supervisor and type of work, together with the application and required disclosures.
Examination
No entrance examination is required for the Apprentice Electrician license.
Application fee
$116 nonrefundable application-processing fee.
Renewal
Renew by November 30 of even-numbered years; the current DOPL renewal fee is $84. Complete 16 approved CE hours per two-year term, including 12 core hours (eight NEC and four NFPA 70E); the other four may be core or professional. DOPL-approved deferrals or waivers are conditional. Renew online unless DOPL permits another method in writing; an expired license does not authorize continued practice.
Official application
Apply / forms →
Journeyman Electrician License License
Issuing authority
Utah Department of Commerce — Division of Professional Licensing →
Scope of work
Wire, install and repair electrical apparatus and equipment for light, heat, power and other purposes within the general electrical scope. An individual license is distinct from the contractor business license and may supervise apprentices subject to the applicable limits.
Experience or qualification
Standard education route: at least 576 hours of approved electrical study completed over no less than 48 months plus 8,000 hours of full-time work as a licensed apprentice. Experience-only route: 16,000 hours as a licensed apprentice. Competency examinations may satisfy education or determine program placement under the separate expedited pathway; they do not establish a blanket waiver of work experience. Credit is limited to 3,000 work hours per 12-month period and lawful experience before application; provide employer verification and required transcripts. Out-of-state hours require official license verification.
Examination
Pass the Utah Journeyman Electrician Written Exam at 75 percent or higher and the Utah Electrician Practical Exam. The standard education route permits exam admission after completing the program and 6,000 apprentice work hours; license issuance still requires 8,000. Current scheduling instructions require first-time school approval for formally trained applicants and experience verification, despite the exam page’s blanket statement that preapproval is unnecessary. Confirm the appropriate pathway with DOPL and Prov before booking.
Application fee
$116 nonrefundable DOPL application-processing fee. Examination charges are separate; the linked Prov bulletin gives inconsistent practical-test fee wording, so confirm the amount for the selected examinations before paying.
Renewal
Renew by November 30 of even-numbered years; the current DOPL renewal fee is $84. Complete 16 approved CE hours per two-year term, including 12 core hours (eight NEC and four NFPA 70E); the other four may be core or professional. DOPL-approved deferrals or waivers are conditional. Renew online unless DOPL permits another method in writing; an expired license does not authorize continued practice.
Official application
Apply / forms →
Master Electrician License License
Issuing authority
Utah Department of Commerce — Division of Professional Licensing →
Scope of work
Plan, lay out and supervise wiring, installation and repair of electrical apparatus and equipment for light, heat, power and other purposes. The individual master license can supply the required qualification for an E200 business but does not itself grant a contractor business license.
Experience or qualification
Qualify through one of three routes: an EAC/ABET-accredited electrical-engineering bachelor’s or master’s degree plus 2,000 work hours as a licensed apprentice; an approved electrical-trade applied-science associate degree plus 4,000 work hours as a licensed journeyman; or 8,000 work hours as a licensed journeyman. Credit is limited to 3,000 work hours per 12-month period and lawful experience before application; provide employer verification and required transcripts. Out-of-state hours require official license verification. The current application, under its combined master-level heading, says 2,000 hours may be verified through associate-degree transcripts. The rule states the work-hour requirements separately and lists no associate-degree route for residential master. Confirm this ambiguous credit instruction with DOPL before subtracting work hours or assuming another qualifying route.
Examination
Pass the Utah Master Electrician Law and Rule Exam at 75 percent or higher. Current DOPL application and exam pages also require the general practical examination unless previously passed for journeyman licensure; R156-55b-302b lists only the master law-and-rule exam for this level. Confirm practical credit and the applicable testing requirement with DOPL.
Application fee
$116 nonrefundable DOPL application-processing fee; separate examination charges apply.
Renewal
Renew by November 30 of even-numbered years; the current DOPL renewal fee is $84. Complete 16 approved CE hours per two-year term, including 12 core hours (eight NEC and four NFPA 70E); the other four may be core or professional. DOPL-approved deferrals or waivers are conditional. Renew online unless DOPL permits another method in writing; an expired license does not authorize continued practice.
Official application
Apply / forms →
E200 General Electrical Contractor License Classification Business license classification
Issuing authority
Utah Department of Commerce — Division of Professional Licensing →
Scope of work
Business classification for general electrical contracting, including the E201 residential and S202 solar-photovoltaic scopes. Hiring and subcontracting remain within the authorized scope.
Experience or qualification
The applicant or business qualifier must hold an active Utah Master Electrician license. The contractor application separately requires two years of paid construction-industry experience (4,000 hours), or a documented qualifying alternative such as a recognized Construction Management degree, Utah professional-engineer license, NASCLA commercial-building examination credit, prior qualifying service or approved endorsement. Supply the qualifier affidavit, financial-responsibility disclosures, business registration and required insurance evidence; the individual master license does not replace the business application.
Examination
Pass the Utah Contractor Business and Law examination unless a documented authorized alternative applies. The usual prelicensure education is the 25-hour course plus five hours of Business and Law. The statute exempts the extra five hours when the 25-hour course was completed before July 1, 2019, while the current agency page says before October 1, 2019; confirm eligibility before relying on that exemption. Separate exemptions exist for specified education, professional licensure, recent qualifying service or approved endorsement. The qualifier’s underlying electrician license has its own examination requirements.
Application fee
$175 per classification plus $50 per qualifier and a $1 electronic-reference-library surcharge: $226 for one classification and one qualifier. Additional ownership-registration charges may apply; examination and course charges are separate.
Renewal
Renew by November 30 of odd-numbered years; the current renewal fee is $128. Complete six approved CE hours per two-year term, including at least three core hours, three hours of live in-class attendance and one hour of energy conservation. The licensee may designate its qualifier, officer, director or supervising individual as permitted by the rule. Maintain required insurance and registrations, and submit the renewal online unless DOPL permits another method in writing. Inactive status does not authorize contracting.
Official application
Apply / forms →
Residential Journeyman Electrician License License
Issuing authority
Utah Department of Commerce — Division of Professional Licensing →
Scope of work
Wire, install and repair electrical apparatus and equipment on buildings using primarily nonmetallic sheath cable within the residential classification. An individual license is distinct from the contractor business license; apprentice supervision remains subject to applicable limits.
Experience or qualification
Standard education route: at least 288 hours of approved electrical study completed over no less than 24 months plus 4,000 hours of full-time work as a licensed apprentice. Experience-only route: the rule requires 8,000 apprentice hours and the statute describes four years; the current application instead says those 8,000 hours must span at least six years. Confirm this unresolved duration discrepancy with DOPL. Competency examinations may satisfy education or determine program placement under the separate expedited pathway. Credit is limited to 3,000 work hours per 12-month period and lawful experience before application; provide employer verification and required transcripts. Out-of-state hours require official license verification.
Examination
Pass the Utah Residential Journeyman Electrician Written Exam at 75 percent or higher and the Utah Residential Electrician Practical Exam. The standard education route permits exam admission after completing the program and 3,000 apprentice work hours; license issuance still requires 4,000. Current scheduling instructions require first-time school approval for formally trained applicants and experience verification, despite the exam page’s blanket statement that preapproval is unnecessary. Confirm the appropriate pathway with DOPL and Prov before booking.
Application fee
$116 nonrefundable DOPL application-processing fee. Examination charges are separate; confirm the selected test fees with Prov because its linked bulletin contains conflicting practical-test charges.
Renewal
Renew by November 30 of even-numbered years; the current DOPL renewal fee is $84. Complete 16 approved CE hours per two-year term, including 12 core hours (eight NEC and four NFPA 70E); the other four may be core or professional. DOPL-approved deferrals or waivers are conditional. Renew online unless DOPL permits another method in writing; an expired license does not authorize continued practice.
Official application
Apply / forms →
Residential Master Electrician License License
Issuing authority
Utah Department of Commerce — Division of Professional Licensing →
Scope of work
Plan, lay out and supervise electrical wiring, installation and repair on residential projects. The individual license can supply the required qualification for an E201 business but does not itself grant a contractor business license.
Experience or qualification
Qualify with 4,000 work hours as a licensed residential journeyman, or an EAC/ABET-accredited electrical-engineering bachelor’s or master’s degree plus 2,000 work hours as a licensed apprentice. DOPL’s exam page describes the degree-route hours as residential experience; confirm acceptance of any other apprentice hours. Credit is limited to 3,000 work hours per 12-month period and lawful experience before application; provide employer verification and required transcripts. Out-of-state hours require official license verification. The current application, under its combined master-level heading, says 2,000 hours may be verified through associate-degree transcripts. The rule states the work-hour requirements separately and lists no associate-degree route for residential master. Confirm this ambiguous credit instruction with DOPL before subtracting work hours or assuming another qualifying route.
Examination
Pass the Utah Master Electrician Law and Rule Exam at 75 percent or higher. The residential-master application page also requires the residential practical examination unless previously passed as a residential journeyman; R156-55b-302b lists only the master law-and-rule exam for this level. Confirm practical credit and the applicable testing requirement with DOPL.
Application fee
$116 nonrefundable DOPL application-processing fee; separate examination charges apply.
Renewal
Renew by November 30 of even-numbered years; the current DOPL renewal fee is $84. Complete 16 approved CE hours per two-year term, including 12 core hours (eight NEC and four NFPA 70E); the other four may be core or professional. DOPL-approved deferrals or waivers are conditional. Renew online unless DOPL permits another method in writing; an expired license does not authorize continued practice.
Official application
Apply / forms →
E201 Residential Electrical Contractor License Classification Business license classification
Issuing authority
Utah Department of Commerce — Division of Professional Licensing →
Scope of work
Business classification for fabrication, construction and installation of residential electrical services, disconnects, grounding, panels, conductors, load centers, lighting and plug circuits, appliances and fixtures within the residential scope. Hiring and subcontracting remain within that scope.
Experience or qualification
The applicant or business qualifier must hold an active Utah Master Electrician or Residential Master Electrician license. The contractor application separately requires two years of paid construction-industry experience (4,000 hours), or a documented qualifying alternative such as a recognized Construction Management degree, Utah professional-engineer license, NASCLA commercial-building examination credit, prior qualifying service or approved endorsement. Supply the qualifier affidavit, financial-responsibility disclosures, business registration and required insurance evidence; the individual master license does not replace the business application.
Examination
Pass the Utah Contractor Business and Law examination unless a documented authorized alternative applies. The usual prelicensure education is the 25-hour course plus five hours of Business and Law. The statute exempts the extra five hours when the 25-hour course was completed before July 1, 2019, while the current agency page says before October 1, 2019; confirm eligibility before relying on that exemption. Separate exemptions exist for specified education, professional licensure, recent qualifying service or approved endorsement. The qualifier’s underlying electrician license has its own examination requirements.
Application fee
$175 per classification plus $50 per qualifier and a $1 electronic-reference-library surcharge: $226 for one classification and one qualifier. Additional ownership-registration charges may apply; examination and course charges are separate.
Renewal
Renew by November 30 of odd-numbered years; the current renewal fee is $128. Complete six approved CE hours per two-year term, including at least three core hours, three hours of live in-class attendance and one hour of energy conservation. The licensee may designate its qualifier, officer, director or supervising individual as permitted by the rule. Maintain required insurance and registrations, and submit the renewal online unless DOPL permits another method in writing. Inactive status does not authorize contracting.
Official application
Apply / forms →

Licensed in another state?

Utah has a reviewed application route for some licenses from 9 states. A route can waive an exam or some experience; you still need the Utah credential before you work. Expand a state for the routes and their requirements.

Colorado Endorsement · 2 routes
If you hold
Colorado Journeyman Electrician license
You can apply for
Utah Journeyman Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The current application has a separate endorsement checklist based on official license verification rather than the initial-licensure training/exam checklist. DOPL determines the examination credit; R156-1-302(4) allows it to require professional or other examinations. The linked 2020 map’s general initial-qualification panel is not a promise that all exams are waived. Obtain DOPL’s determination before scheduling or assuming an examination exemption.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Colorado Journeyman Electrician license to Utah Journeyman Electrician license only. The currently linked receiving map is dated July 1, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Checked 2026-09-15.

If you hold
Colorado Master Electrician license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Colorado Master Electrician license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Checked 2026-09-15.

Colorado licensing →

Louisiana Endorsement
If you hold
Louisiana responsible qualifying individual for an Electrical contractor license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The Utah Master map uses light blue for this contractor credential: the responsible person MAY qualify. The applicant must demonstrate that they personally met the licensing requirements on behalf of the contractor. Company ownership, employment, a business card or a company license alone does not establish that role. Obtain source-regulator verification of the exact classification, responsible-person identity, qualification/examination basis, dates and practice, then DOPL’s approval of the individual Master application. This is a conditional individual application route, not automatic recognition of a company as a Utah Master Electrician.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Louisiana responsible qualifying individual for an Electrical contractor license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Checked 2026-09-15.

Louisiana licensing →

Nevada Endorsement
If you hold
Nevada responsible trade qualifying individual for a full C-2 Electrical contractor license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The Utah Master map uses light blue for this contractor credential: the responsible person MAY qualify. The applicant must demonstrate that they personally met the licensing requirements on behalf of the contractor. Company ownership, employment, a business card or a company license alone does not establish that role. Obtain source-regulator verification of the exact classification, responsible-person identity, qualification/examination basis, dates and practice, then DOPL’s approval of the individual Master application. This is a conditional individual application route, not automatic recognition of a company as a Utah Master Electrician.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Nevada responsible trade qualifying individual for a full C-2 Electrical contractor license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.
  • The mapping names the full Nevada C-2 classification. A restricted C-2 subclassification, a local journeyman card or a different company’s qualifier record is not established as equivalent by this row.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Checked 2026-09-15.

Nevada licensing →

New Mexico Endorsement · 3 routes
If you hold
New Mexico EE-98J Journeyman Residential and Commercial Electrical certificate
You can apply for
Utah Journeyman Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The current application has a separate endorsement checklist based on official license verification rather than the initial-licensure training/exam checklist. DOPL determines the examination credit; R156-1-302(4) allows it to require professional or other examinations. The linked 2020 map’s general initial-qualification panel is not a promise that all exams are waived. Obtain DOPL’s determination before scheduling or assuming an examination exemption.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed New Mexico EE-98J Journeyman Residential and Commercial Electrical certificate to Utah Journeyman Electrician license only. The currently linked receiving map is dated July 1, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.
  • New Mexico EE-98J is residential/commercial journeyman certification; EL-1J is electrical distribution/transmission-line journeyman certification. Utah’s current-linked map expressly names both, but they are separate source scopes and are published here as separate routes. ER-1J, electrical specialties and the EE-98 business license are not substitutes for these personal credentials. DOPL must evaluate the actual record and any source restrictions.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Checked 2026-09-15.

If you hold
New Mexico EL-1J Journeyman Electrical Distribution Systems including Transmission Lines certificate
You can apply for
Utah Journeyman Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The current application has a separate endorsement checklist based on official license verification rather than the initial-licensure training/exam checklist. DOPL determines the examination credit; R156-1-302(4) allows it to require professional or other examinations. The linked 2020 map’s general initial-qualification panel is not a promise that all exams are waived. Obtain DOPL’s determination before scheduling or assuming an examination exemption.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed New Mexico EL-1J Journeyman Electrical Distribution Systems including Transmission Lines certificate to Utah Journeyman Electrician license only. The currently linked receiving map is dated July 1, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.
  • New Mexico EE-98J is residential/commercial journeyman certification; EL-1J is electrical distribution/transmission-line journeyman certification. Utah’s current-linked map expressly names both, but they are separate source scopes and are published here as separate routes. ER-1J, electrical specialties and the EE-98 business license are not substitutes for these personal credentials. DOPL must evaluate the actual record and any source restrictions.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Checked 2026-09-15.

If you hold
New Mexico responsible qualifying individual for an EE-98 contractor license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The Utah Master map uses light blue for this contractor credential: the responsible person MAY qualify. The applicant must demonstrate that they personally met the licensing requirements on behalf of the contractor. Company ownership, employment, a business card or a company license alone does not establish that role. Obtain source-regulator verification of the exact classification, responsible-person identity, qualification/examination basis, dates and practice, then DOPL’s approval of the individual Master application. This is a conditional individual application route, not automatic recognition of a company as a Utah Master Electrician.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed New Mexico responsible qualifying individual for an EE-98 contractor license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.
  • New Mexico EE-98J is residential/commercial journeyman certification; EL-1J is electrical distribution/transmission-line journeyman certification. Utah’s current-linked map expressly names both, but they are separate source scopes and are published here as separate routes. ER-1J, electrical specialties and the EE-98 business license are not substitutes for these personal credentials. DOPL must evaluate the actual record and any source restrictions.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Official source 15 · Checked 2026-09-15.

New Mexico licensing →

North Dakota Endorsement · 2 routes
If you hold
North Dakota Journeyman Electrician license
You can apply for
Utah Journeyman Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The current application has a separate endorsement checklist based on official license verification rather than the initial-licensure training/exam checklist. DOPL determines the examination credit; R156-1-302(4) allows it to require professional or other examinations. The linked 2020 map’s general initial-qualification panel is not a promise that all exams are waived. Obtain DOPL’s determination before scheduling or assuming an examination exemption.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed North Dakota Journeyman Electrician license to Utah Journeyman Electrician license only. The currently linked receiving map is dated July 1, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Checked 2026-09-15.

If you hold
North Dakota Master Electrician license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed North Dakota Master Electrician license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.
  • North Dakota distinguishes contracting master, master of record and non-contracting master status. Provide the actual category and practice record; Utah’s general Master map does not erase source restrictions or independently grant Utah contracting authority.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Checked 2026-09-15.

North Dakota licensing →

Oregon Endorsement · 2 routes
If you hold
Oregon General Journeyman Electrician (J) license
You can apply for
Utah Journeyman Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The current application has a separate endorsement checklist based on official license verification rather than the initial-licensure training/exam checklist. DOPL determines the examination credit; R156-1-302(4) allows it to require professional or other examinations. The linked 2020 map’s general initial-qualification panel is not a promise that all exams are waived. Obtain DOPL’s determination before scheduling or assuming an examination exemption.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Oregon General Journeyman Electrician (J) license to Utah Journeyman Electrician license only. The currently linked receiving map is dated July 1, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Checked 2026-09-15.

If you hold
Oregon General Supervising Electrician (S) license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Oregon General Supervising Electrician (S) license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Checked 2026-09-15.

Oregon licensing →

South Carolina Endorsement
If you hold
South Carolina responsible qualifying party for a Mechanical Contractor license with Electrical (EL) classification
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The Utah Master map uses light blue for this contractor credential: the responsible person MAY qualify. The applicant must demonstrate that they personally met the licensing requirements on behalf of the contractor. Company ownership, employment, a business card or a company license alone does not establish that role. Obtain source-regulator verification of the exact classification, responsible-person identity, qualification/examination basis, dates and practice, then DOPL’s approval of the individual Master application. This is a conditional individual application route, not automatic recognition of a company as a Utah Master Electrician.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed South Carolina responsible qualifying party for a Mechanical Contractor license with Electrical (EL) classification to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.
  • Provide the South Carolina Mechanical Contractor Electrical (EL) classification, group limitations and the applicant’s qualifying-party certificate/role. General-contractor public electrical utility, residential-specialty and business-only records are not interchangeable with this responsible-person mapping.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Checked 2026-09-15.

South Carolina licensing →

South Dakota Endorsement · 2 routes
If you hold
South Dakota Journeyman Electrician license
You can apply for
Utah Journeyman Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The current application has a separate endorsement checklist based on official license verification rather than the initial-licensure training/exam checklist. DOPL determines the examination credit; R156-1-302(4) allows it to require professional or other examinations. The linked 2020 map’s general initial-qualification panel is not a promise that all exams are waived. Obtain DOPL’s determination before scheduling or assuming an examination exemption.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed South Dakota Journeyman Electrician license to Utah Journeyman Electrician license only. The currently linked receiving map is dated July 1, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Checked 2026-09-15.

If you hold
South Dakota responsible individual holding the Electrical Contractor license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The Utah Master map uses light blue for this contractor credential: the responsible person MAY qualify. The applicant must demonstrate that they personally met the licensing requirements on behalf of the contractor. Company ownership, employment, a business card or a company license alone does not establish that role. Obtain source-regulator verification of the exact classification, responsible-person identity, qualification/examination basis, dates and practice, then DOPL’s approval of the individual Master application. This is a conditional individual application route, not automatic recognition of a company as a Utah Master Electrician.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed South Dakota responsible individual holding the Electrical Contractor license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.
  • This names the South Dakota Electrical Contractor credential and its responsible individual; Class B farmstead/residential and journeyman credentials do not establish this personal Master mapping.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Official source 14 · Checked 2026-09-15.

South Dakota licensing →

Texas Endorsement · 2 routes
If you hold
Texas Journeyman Electrician license
You can apply for
Utah Journeyman Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • The current application has a separate endorsement checklist based on official license verification rather than the initial-licensure training/exam checklist. DOPL determines the examination credit; R156-1-302(4) allows it to require professional or other examinations. The linked 2020 map’s general initial-qualification panel is not a promise that all exams are waived. Obtain DOPL’s determination before scheduling or assuming an examination exemption.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Texas Journeyman Electrician license to Utah Journeyman Electrician license only. The currently linked receiving map is dated July 1, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Checked 2026-09-15.

If you hold
Texas Master Electrician license
You can apply for
Utah Master Electrician license

To apply:

  • Utah Code 58-1-302(2) requires at least one year of experience practicing under the source license, good standing and DOPL’s determination of similar scope. Merely holding a card for one year is insufficient. The application/map also requests active licensure held for at least one year; provide official verification of dates, standing and the actual licensed practice.
  • Submit the completed Utah electrician application selecting the receiving credential, the signed affidavit/release, requested identity and lawful-presence documentation, and the standard $116 nonrefundable application-processing fee unless a statutory fee waiver is established. Submit the supporting documents for every applicable yes answer on the qualifying questionnaire. Use DOPL’s current application and send personal information directly to the regulator.
  • Obtain official verification from the source licensing authority. Utah’s linked verification form asks for license type, issue/expiry dates, examination date/score and method of initial licensure (including apprenticeship, work experience, endorsement/reciprocity or other), and disciplinary history with certified records. Supply evidence of actual practice and any scope restrictions; a source credential obtained by reciprocity is not automatically rejected or automatically accepted under Utah’s individualized endorsement law.
  • Disclose previous or pending professional discipline and the qualifying-questionnaire matters. Under 58-1-302(4), DOPL may refuse endorsement for qualification concerns or previous/pending license discipline; good standing does not erase the disclosure requirement.
  • Active-status conflict: the current electrician application and linked maps request an active license in good standing held for at least one year. Utah R156-1-302(2) says an endorsement applicant with the required experience practicing under the other jurisdiction’s license need not have that license currently active. Inactive-license applicants should request DOPL’s individual determination; this listing does not declare them ineligible or silently waive the application instruction.
  • Pass the Utah Master Electrician Law and Rule examination with at least 75%, as required by the current endorsement application and Master page. DOPL’s 2020 map contains older generic Theory/Code/Practical examination wording; the current page lists a practical examination with prior-journeyman practical credit, while the endorsement checklist specifically names Law and Rule. R156-1-302(4) permits DOPL to require professional exams. Obtain DOPL’s determination of any remaining practical/professional examination; this route does not promise a blanket examination waiver. Exam-provider fees are separate from the $116 application fee.
  • Wait for DOPL approval and issuance of the Utah license. An out-of-state license, map entry or submitted application provides no permission to start Utah electrical work through this route.

Limits:

  • Directed Texas Master Electrician license to Utah Master Electrician license only. The currently linked receiving map is dated July 27, 2020; the review date is the date this content was reviewed, not a new map publication date or a guarantee of approval. DOPL decides the applicant’s exact scope and qualifications under current law. No reverse eligibility is inferred.
  • Personal electrical licensure does not itself authorize a contracting business. Utah E200/E201 business licensing and the required Utah electrical qualifier are separate. Local permits, inspections and applicable business requirements remain; work only within the Utah credential actually issued. Use the reviewed Utah licensing page for the complete licensing and renewal framework.
  • These are Utah endorsement application pathways, not a finding of a bilateral reciprocity agreement, automatic transfer or permission to work. Utah Code 58-1-302(3) and (6) permits individualized competency, education, examination and experience evaluation, potentially with additional requirements. A limited supervised training permit requires a separate DOPL decision and the statutory employment, supervision and other conditions; it does not arise automatically from an application. Military and emergency provisions are separate and applicant-specific. No blanket temporary or universal-recognition work authorization is established here.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Official source 11 · Official source 12 · Official source 13 · Checked 2026-09-15.

Texas licensing →

Taking your Utah license elsewhere

Reviewed routes for Utah licensees, with requirements on each receiving state's page:

  • Colorado: Utah Journeyman Electrician certificate (Utah DOPL), obtained by state-administered examination → Colorado journeyman electrician certificate (Colorado State Electrical Board / Division of Professions and Occupations) (reciprocity)
  • Montana: Utah Journeyman Electrician (JE) license → Montana Journeyman Electrician license (endorsement)
  • Montana: Utah Master Electrician (ME) license → Montana Master Electrician license (endorsement)
  • Montana: Utah Residential Journeyman Electrician (RJE) license → Montana Residential Electrician license (endorsement)
  • Oregon: Utah Journeyman Electrician license (Utah DOPL), obtained by examination with a minimum score of 75% → Oregon General Journeyman Electrician (J) license (Oregon Building Codes Division) (reciprocity)
  • Oregon: Utah Master Electrician certificate (Utah DOPL), obtained by examination with a minimum score of 75% → Oregon General Supervising Electrician (S) license (Oregon Building Codes Division) (reciprocity)
  • Vermont: Utah Journeyman Electrician license (Utah DOPL), licensed in good standing for at least three years → Vermont journeyman electrician license (Vermont Electricians' Licensing Board / Division of Fire Safety) (endorsement)
  • Vermont: Utah Master Electrician license (Utah DOPL), licensed in good standing for at least three years → Vermont master electrician license (Vermont Electricians' Licensing Board / Division of Fire Safety) (endorsement)
  • Virginia: Utah Journeyman Electrician license (Utah DOPL), exam-based, held at least one year → Virginia Licensed Journeyman Electrical (ELE) tradesman certification (DPOR Board for Contractors) (universal license recognition)
  • Virginia: Utah Master Electrician license (Utah DOPL), exam-based, held at least one year → Virginia Licensed Master Electrical (ELE) tradesman certification (DPOR Board for Contractors) (universal license recognition)
  • West Virginia: Utah Journeyman Electrician license (Utah DOPL), in good standing → West Virginia journeyman electrician license (West Virginia State Fire Marshal) (exam waiver)
  • West Virginia: Utah Master Electrician license (Utah DOPL), in good standing → West Virginia master electrician license (West Virginia State Fire Marshal) (exam waiver)
  • Wyoming: Utah Journeyman Electrician license → Wyoming Journeyman Electrician license (exam waiver)

Examination eligibility and licensing requirements

Early examination admission and license issuance are different stages. On the standard education route, the rule allows journeyman testing after the approved program and 6,000 apprentice hours, but requires 8,000 hours for licensure. The corresponding residential thresholds are 3,000 hours for testing and 4,000 for licensure. The approved competency-exam sequence can satisfy education or determine placement; DOPL’s separate out-of-state competency assessment evaluates documented education and work, and submitting that assessment is not a license application.

DOPL’s exam page says preapproval is not required, but its linked 2026 Prov bulletin requires first-time approval from the training school for formally educated journeyman and residential-journeyman candidates. DOPL also directs candidates to attach experience verification to their Prov registration, and the bulletin requests transcripts for out-of-state training. Confirm the applicable scheduling process with DOPL and Prov. The bulletin gives conflicting practical-test fee wording; verify your test charges before paying.

Two other discrepancies remain explicit in the credential details: the residential experience-only application says eight thousand hours over at least six years, while the statute describes four years and the rule requires eight thousand hours; and the master-level agency pages require practical testing unless already credited, while the examination rule lists the master law-and-rule exam. Obtain DOPL’s determination for your circumstances before relying on either interpretation.

Contractor and business responsibilities

The contractor application is separate from the qualifying person’s electrician license. It requires the applicable prelicensure education or documented exemption, Business and Law examination or authorized alternative, construction experience or approved alternative, financial disclosures, and business and tax registrations. The statute’s five-hour-course grandfather date is July 1, 2019; the agency instructions instead say October 1, 2019. Confirm that discrepancy before claiming an exemption.

The current insurance rule and agency instructions specify liability coverage of at least $1 million per incident and $2 million total, with DOPL as certificate holder. The March 2026 contractor application instead requests $3 million total. Confirm the certificate requirements with DOPL before submission. Workers’ compensation coverage or a valid no-employee waiver is also required, with employment, unemployment and tax registrations as applicable. Financial-responsibility issues can trigger additional documentation or a required bond.

Local requirements and related work

State licensing does not replace job-site permits, inspections or applicable local ordinances. The statute recognizes the business license issued where the licensee has its principal place of business and restricts additional local licensing demands. Check the authority for the actual project; this page does not inventory every local office or declare that no local requirements apply.

Specialty scopes, including solar, signs, alarms, elevators and utility work, require their own classification and exemption analysis. E200 includes the S202 solar-photovoltaic scope, but that does not turn every specialty holder into a general electrician. Apprentices remain subject to supervision rules. Inactive status prohibits practice; emergency authorizations depend on DOPL’s express terms and expiration, and no open emergency licensing window is asserted here.

Out-of-state and military pathways

Licensure by endorsement is a conditional application pathway. The current electrician form asks for official verification of an active, good-standing license held for at least one year in a DOPL-designated equivalent jurisdiction and preserves master law-and-rule testing. Other applicants may document prior experience toward initial licensure or request DOPL’s competency assessment. The residential-journeyman electrician page currently links to a plumber endorsement map; use DOPL confirmation rather than treating that map as electrical eligibility. No directed state-to-state route is established by this page.

Qualifying military service members and spouses may have fee waivers, license extensions or exemption pathways. Use DOPL’s military instructions and the applicable statutory conditions; an inactive license or a pending application alone does not grant permission to work.

Before you apply

Use the current DOPL electrical licensing pages or the contractor application for the appropriate credential. Submit the required qualification disclosures and supporting records. Use the official electrical renewal instructions or contractor renewal instructions and check your status through Utah License Lookup. Complete required CE and keep your license active before practicing. Confirm unresolved application or examination discrepancies with DOPL at 801-530-6628.

View Application Information → License Lookup →

Cite this page
Title
Electrician Licensing in Utah
URL
https://tradesdir.com/electrical/licensing/utah
Information checked
2026-09-15

Suggested citation: Electrician Licensing in Utah. Trades Directory. https://tradesdir.com/electrical/licensing/utah (information checked 2026-09-15).

← All States