Licensing

Electrician Licensing in Montana

Montana licenses electricians statewide. The journeyman-level credential is the Journeyman Electrician License, issued by the Montana State Electrical Board.

Source: Montana Legislature (Montana Code Annotated 37-68-301), checked 2026-10-07

Page last reviewed 2026-09-14 against official sources. Confirm with the issuing authority before applying.

Licensed in another state? See reviewed routes into Montana.

How electrical licensing works in Montana

Montana licenses individual electricians and electrical contracting businesses at the state level. An individual license and a contractor license serve different purposes: the business must designate the appropriately qualified responsible electrician. This page covers the permanent worker and contractor licenses, with temporary and other pathways explained separately.

Credential-specific requirements

Requirements differ by credential. Expand any credential for the work or business activity you plan to perform. Issued by Montana State Electrical Board unless noted.

Journeyman Electrician License License
Issuing authority
Montana State Electrical Board →
Scope of work
Wiring, installing and repairing electrical apparatus and equipment for light, heat, power and other purposes. A journeyman who is not a contractor’s responsible electrician works only as an employee of a licensed electrical contractor.
Experience or qualification
Provide written evidence of an approved electrical apprenticeship or substantially equivalent program; 8,000 hours of legally obtained practical experience; or 20,000 hours of electrical maintenance with employer certification, including at least 8,000 practical hours. The 2025 statute excludes experience from an apprenticeship that was not completed. No more than 50% of practical experience may be residential; the balance must be commercial, industrial or institutional. The linked form’s residential-only wording conflicts with this broader statutory and rule scope.
Examination
Board approval is required before examination. Pass the examination at 70% within one year of approval; otherwise reapply and pay the applicable fees. After a second failure, document an approved eight-hour electrical code seminar taken since the initial failure. A substantially equivalent out-of-state license is a separate application pathway, not automatic permission to work. Current ARM 24.141.502 calls temporary authority a provisional license: normally 90 days or until examination results, with possible case-by-case extension if it expires before the scheduled examination. It permits employment with a licensed contractor, not service as the responsible electrician. The current rule bars a second provisional license after a residential or journeyman score of 64% or less; older forms say 65% or less and the FAQ describes different timing and scoring. Obtain a Board determination for a retry rather than assuming eligibility.
Application fee
$190 application fee, including the original license; the optional temporary/provisional authorization is listed at $50. Testing-agency examination fees are separate and paid directly after Board approval. Fees are nonrefundable.
Renewal
Biennial renewal; standing fee $140. Complete 16 hours during the renewal cycle, including at least eight hours of NEC updates. Graduates of approved apprenticeship programs are exempt for the first renewal cycle; advancing to a higher license does not create an exemption. Keep completion records for audit. The 2026 renewal window was May 15–July 15, with a 50% fee abatement; that window has closed and late charges may apply. Confirm the amount currently due.
Official application
Apply / forms →
Master Electrician License License
Issuing authority
Montana State Electrical Board →
Scope of work
Planning, laying out and supervising electrical installation and repair. A master who is not a contractor’s responsible electrician works only as an employee of a licensed electrical contractor.
Experience or qualification
Provide written evidence of graduation in electrical engineering from an accredited college or university plus at least 2,000 hours of legally obtained practical electrical experience; or at least 8,000 hours of legally obtained journeyman-level planning, layout or supervision experience. No more than 50% of practical or journeyman-level experience may be residential. Hours served in an apprenticeship are not journeyman-level experience.
Examination
Board approval is required before examination. Pass the master examination at 75% within one year of approval; otherwise reapply and pay the applicable fees. After a second failure, document an approved eight-hour electrical code seminar taken since the initial failure. A substantially equivalent out-of-state license is a separate application pathway, not automatic permission to work. Current ARM 24.141.502 calls temporary authority a provisional license: normally 90 days or until examination results, with possible case-by-case extension if it expires before the scheduled examination. It permits employment with a licensed contractor, not service as the responsible electrician. The linked master application describes journeyman-level temporary practice. The current rule bars a second provisional license after a master-exam score of 69% or less.
Application fee
$190 application fee, including the original license; the optional temporary/provisional authorization is listed at $50. Testing-agency examination fees are separate and paid directly after Board approval. Fees are nonrefundable.
Renewal
Biennial renewal; standing fee $140. Complete 16 hours during the renewal cycle, including at least eight hours of NEC updates. Graduates of approved apprenticeship programs are exempt for the first renewal cycle; advancing to a higher license does not create an exemption. Keep completion records for audit. The 2026 renewal window was May 15–July 15, with a 50% fee abatement; that window has closed and late charges may apply. Confirm the amount currently due.
Official application
Apply / forms →
Unlimited Electrical Contractor License Business license
Issuing authority
Montana State Electrical Board →
Scope of work
Business license for commercial, residential, industrial and institutional electrical installations covered by the NEC. The linked application abbreviates this as residential and commercial; the current rule supplies the full scope.
Experience or qualification
Affirm compliance with workers’ compensation and unemployment-insurance law and designate a Montana-licensed master as responsible electrician. An owner without that qualification must employ the appropriate electrician full time. A master may be responsible for only one unlimited electrical contractor. The departing electrician and contractor must notify the Board within ten working days; failure to name a replacement within ten working days can lead to suspension and revocation.
Examination
The contractor application requires the appropriate licensed responsible electrician and business-compliance documentation. The responsible-electrician designation is attached to the business license; it is not another independent license.
Application fee
$210 original contractor license fee; fees are nonrefundable.
Renewal
Biennial renewal; standing contractor fee $210. Renewal includes affirming workers’ compensation and unemployment-insurance compliance. The responsible electrician must maintain the applicable individual license. The 2026 renewal window was May 15–July 15, with a 50% fee abatement; that window has closed and late charges may apply. Confirm the amount currently due. No separate numeric continuing-education total is asserted here for the business entity.
Official application
Apply / forms →
Residential Electrician License License
Issuing authority
Montana State Electrical Board →
Scope of work
Electrical work in residential construction with fewer than five living units in one structure, only as an employee of a licensed electrical contractor.
Experience or qualification
Provide written evidence of an approved residential apprenticeship or substantially equivalent program; 4,000 hours of legally obtained residential practical experience; or 20,000 hours of electrical maintenance with employer certification, including at least 8,000 practical hours. The 2025 statute excludes experience from an apprenticeship that was not completed. The linked application’s checklist still asks for 8,000 residential hours although its requirements section and the statute say 4,000; ask the Board which documentation it requires.
Examination
Board approval is required before examination. Pass the examination at 70% within one year of approval; otherwise reapply and pay the applicable fees. After a second failure, document an approved eight-hour electrical code seminar taken since the initial failure. A substantially equivalent out-of-state license is a separate application pathway, not automatic permission to work. Current ARM 24.141.502 calls temporary authority a provisional license: normally 90 days or until examination results, with possible case-by-case extension if it expires before the scheduled examination. It permits employment with a licensed contractor, not service as the responsible electrician. The current rule bars a second provisional license after a residential or journeyman score of 64% or less; older forms say 65% or less and the FAQ describes different timing and scoring. Obtain a Board determination for a retry rather than assuming eligibility.
Application fee
$190 application fee, including the original license; the optional temporary/provisional authorization is listed at $50. Testing-agency examination fees are separate and paid directly after Board approval. Fees are nonrefundable.
Renewal
Biennial renewal; standing fee $140. Complete 16 hours during the renewal cycle, including at least eight hours of NEC updates. Graduates of approved apprenticeship programs are exempt for the first renewal cycle; advancing to a higher license does not create an exemption. Keep completion records for audit. The 2026 renewal window was May 15–July 15, with a 50% fee abatement; that window has closed and late charges may apply. Confirm the amount currently due.
Official application
Apply / forms →
Limited Electrical Contractor License Business license
Issuing authority
Montana State Electrical Board →
Scope of work
Business license for residential construction with fewer than five living units in one structure.
Experience or qualification
Affirm compliance with workers’ compensation and unemployment-insurance law and designate a Montana-licensed journeyman as responsible electrician. An owner without that qualification must employ the appropriate electrician full time. A journeyman may be responsible for only one electrical contractor. The departing electrician and contractor must notify the Board within ten working days; failure to name a replacement within ten working days can lead to suspension and revocation.
Examination
The contractor application requires the appropriate licensed responsible electrician and business-compliance documentation. The responsible-electrician designation is attached to the business license; it is not another independent license.
Application fee
$210 original contractor license fee; fees are nonrefundable.
Renewal
Biennial renewal; standing contractor fee $210. Renewal includes affirming workers’ compensation and unemployment-insurance compliance. The responsible electrician must maintain the applicable individual license. The 2026 renewal window was May 15–July 15, with a 50% fee abatement; that window has closed and late charges may apply. Confirm the amount currently due. No separate numeric continuing-education total is asserted here for the business entity.
Official application
Apply / forms →

Licensed in another state?

Montana has a reviewed application route for some licenses from 11 states. A route can waive an exam or some experience; you still need the Montana credential before you work. Expand a state for the routes and their requirements.

Alaska Endorsement · 2 routes
If you hold
Alaska Electrician Journeyman Certificate of Fitness
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Alaska Electrician Journeyman Certificate of Fitness in good standing. Montana’s adopted substantial-equivalency table lists Alaska Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

If you hold
Alaska Residential Wireman Certificate of Fitness
You can apply for
Montana Residential Electrician license

To apply:

  • Hold an active, unrestricted Alaska Residential Wireman Certificate of Fitness in good standing. Montana’s adopted substantial-equivalency table lists Alaska Yes at the residential level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana residential application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.
  • The Montana residential application has conflicting 4,000-hour and 8,000-hour experience-checklist references for examination applicants. This route relies on the adopted residential substantial-equivalency determination; if Montana requests additional experience evidence, obtain its direction rather than treating that internal form conflict as a confirmed requirement.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Alaska licensing →

Arkansas Endorsement · 2 routes
If you hold
Arkansas Journeyman Electrician license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Arkansas Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Arkansas Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

If you hold
Arkansas Residential Journeyman Electrician license
You can apply for
Montana Residential Electrician license

To apply:

  • Hold an active, unrestricted Arkansas Residential Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Arkansas Yes at the residential level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana residential application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.
  • The Montana residential application has conflicting 4,000-hour and 8,000-hour experience-checklist references for examination applicants. This route relies on the adopted residential substantial-equivalency determination; if Montana requests additional experience evidence, obtain its direction rather than treating that internal form conflict as a confirmed requirement.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Arkansas licensing →

Colorado Endorsement
If you hold
Colorado Journeyman Electrician license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Colorado Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Colorado Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Colorado licensing →

Idaho Endorsement · 2 routes
If you hold
Idaho Journeyman Electrician license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Idaho Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Idaho Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

If you hold
Idaho Master Electrician license
You can apply for
Montana Master Electrician license

To apply:

  • Hold an active, unrestricted Idaho Master Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Idaho Yes at the master level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana master application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Idaho licensing →

Iowa Endorsement
If you hold
Iowa Class A Journeyman Electrician license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Iowa Class A Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Iowa Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Iowa licensing →

North Dakota Endorsement
If you hold
North Dakota Journeyman Electrician license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted North Dakota Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists North Dakota Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

North Dakota licensing →

Oklahoma Endorsement
If you hold
Oklahoma Unlimited Electrical Journeyman license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Oklahoma Unlimited Electrical Journeyman license in good standing. Montana’s adopted substantial-equivalency table lists Oklahoma Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Oklahoma licensing →

Oregon Endorsement · 2 routes
If you hold
Oregon General Journeyman Electrician (J) license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Oregon General Journeyman Electrician (J) license in good standing. Montana’s adopted substantial-equivalency table lists Oregon Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

If you hold
Oregon Limited Residential Electrician (LR) license
You can apply for
Montana Residential Electrician license

To apply:

  • Hold an active, unrestricted Oregon Limited Residential Electrician (LR) license in good standing. Montana’s adopted substantial-equivalency table lists Oregon Yes at the residential level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana residential application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.
  • The Montana residential application has conflicting 4,000-hour and 8,000-hour experience-checklist references for examination applicants. This route relies on the adopted residential substantial-equivalency determination; if Montana requests additional experience evidence, obtain its direction rather than treating that internal form conflict as a confirmed requirement.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Oregon licensing →

South Dakota Endorsement
If you hold
South Dakota Journeyman Electrician license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted South Dakota Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists South Dakota Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

South Dakota licensing →

Utah Endorsement · 3 routes
If you hold
Utah Journeyman Electrician (JE) license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Utah Journeyman Electrician (JE) license in good standing. Montana’s adopted substantial-equivalency table lists Utah Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

If you hold
Utah Master Electrician (ME) license
You can apply for
Montana Master Electrician license

To apply:

  • Hold an active, unrestricted Utah Master Electrician (ME) license in good standing. Montana’s adopted substantial-equivalency table lists Utah Yes at the master level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana master application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

If you hold
Utah Residential Journeyman Electrician (RJE) license
You can apply for
Montana Residential Electrician license

To apply:

  • Hold an active, unrestricted Utah Residential Journeyman Electrician (RJE) license in good standing. Montana’s adopted substantial-equivalency table lists Utah Yes at the residential level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana residential application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.
  • The Montana residential application has conflicting 4,000-hour and 8,000-hour experience-checklist references for examination applicants. This route relies on the adopted residential substantial-equivalency determination; if Montana requests additional experience evidence, obtain its direction rather than treating that internal form conflict as a confirmed requirement.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Utah licensing →

Wyoming Endorsement · 2 routes
If you hold
Wyoming Journeyman Electrician license
You can apply for
Montana Journeyman Electrician license

To apply:

  • Hold an active, unrestricted Wyoming Journeyman Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Wyoming Yes at the journeyman level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana journeyman application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

If you hold
Wyoming Master Electrician license
You can apply for
Montana Master Electrician license

To apply:

  • Hold an active, unrestricted Wyoming Master Electrician license in good standing. Montana’s adopted substantial-equivalency table lists Wyoming Yes at the master level. Montana determines the qualifying credential and applicant eligibility; its application requires an electrical examination basis for substantial equivalency.
  • Submit the Montana master application and the $190 application fee, which includes the original license fee. Supply verification of every professional license ever held, including expired licenses. The current checklist permits copies of online license verifications attached to the application or sent with the application number.
  • Answer the application’s personal-history and attestation questions and supply the required disciplinary-action and criminal-conviction documents. Substantially equivalent applications are routine for education, examination and experience under ARM 24.141.508, but can be nonroutine on other grounds. Obtain Montana approval and license issuance before working under this license.

Limits:

  • This is licensure by endorsement based on substantial equivalency, not automatic transfer or permission to start work. The application states that an applicant who is not substantially equivalent must take Montana’s examination; MCA 37-1-304(2) also requires the Board to assess whether actual qualifications and work experience address a deficiency. Do not treat a table entry as an individual license decision.
  • The confirmed scope is the exact source personal credential named above at the corresponding Montana level. It does not cover apprentice, provisional, contractor/business, municipal-only, other specialty or differently restricted licenses, substitutions between levels, or a license obtained without the required examination basis. Other pathways are not declared unavailable.
  • Montana’s personal electrician license does not itself license an electrical contracting business or replace state or local work permits. Electrical contractor licensing, responsible-electrician and employment requirements are separate; consult the Montana licensing page before contracting or beginning work.
  • The former ARM 24.141.504 was repealed effective February 7, 2026. Older reciprocity lists, one-year holding conditions and the older $250 application fee are not used as the requirements for this current endorsement route. No additional minimum holding period or residency condition is established by the cited current Montana substantial-equivalency rule and checklist; applicant-specific questions remain for the Board.

Endorsement. Official source 1 · Official source 2 · Official source 3 · Official source 4 · Official source 5 · Official source 6 · Official source 7 · Official source 8 · Official source 9 · Official source 10 · Checked 2026-09-15.

Wyoming licensing →

Taking your Montana license elsewhere

Reviewed routes for Montana licensees, with requirements on each receiving state's page:

  • Alaska: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI), obtained by passing the state examination → Alaska Electrical Journeyman Certificate of Fitness (Alaska DOLWD Labor Standards & Safety, Mechanical Inspection Section) (reciprocity)
  • Arkansas: Montana Journeyman Electrician license → Arkansas Journeyman Electrician license (reciprocity)
  • Colorado: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI), gained through a state-administered examination → Colorado journeyman electrician certificate (Colorado State Electrical Board, DORA Division of Professions and Occupations) (reciprocity)
  • Idaho: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI), obtained by examination → Idaho journeyman electrician license by reciprocal application (Idaho Electrical Board, DOPL) (reciprocity)
  • Iowa: Montana Journeyman Electrician license → Iowa Class A Journeyman Electrician license (reciprocity)
  • Iowa: Montana Master Electrician license → Iowa Class A Journeyman Electrician license (reciprocity)
  • Minnesota: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI), obtained by state-level examination → Minnesota Class A Journeyworker Electrician license without examination (Minnesota Department of Labor and Industry) (reciprocity)
  • Nebraska: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI), state examination with a score of 75% or greater, verifiable by the issuing state → Nebraska journeyman electrician license by reciprocity (Nebraska State Electrical Division / State Electrical Board) (reciprocity)
  • New Mexico: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI) → New Mexico EE-98J journeyman certificate by reciprocity (NM RLD Construction Industries Division, Electrical Bureau) (reciprocity)
  • North Dakota: Montana Journeyman Electrician license → North Dakota Journeyman Electrician license (reciprocity)
  • Oklahoma: Montana Journeyman Electrician license → Oklahoma reciprocal Electrical Journeyman license; final category determined by CIB (reciprocity)
  • Oregon: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI), obtained by examination with a minimum score of 75% → Oregon General Journeyman Electrician (J) license (Oregon Building Codes Division) (reciprocity)
  • South Dakota: Montana journeyman electrician license (Montana State Electrical Board, Montana DLI), earned by examination → South Dakota journeyman electrician license (JM) by reciprocity (South Dakota Electrical Commission, DLR) (reciprocity)
  • South Dakota: Montana master electrician license (Montana State Electrical Board, Montana DLI), earned by examination → South Dakota Master Electrician (EC) license by reciprocity (South Dakota Electrical Commission, DLR) (reciprocity)
  • Wyoming: Montana Journeyman Electrician license → Wyoming Journeyman Electrician license (exam waiver)

Workers and contracting businesses

A Limited Electrical Contractor uses a licensed journeyman as responsible electrician and is restricted to residential construction with fewer than five living units in one structure. An Unlimited Electrical Contractor uses a licensed master and has the broader scope shown in the credential disclosures. The Board’s contractor webpage describes only a master responsible party, but current ARM 24.141.505 retains both classes. A responsible-electrician designation is not a separate license.

Permits and local jurisdiction

State licensing does not replace electrical permits and inspections. The job-site jurisdiction determines whether the state or a certified local government handles the permit. Check the official permit guidance before starting work; this page does not inventory every local business-license or permit requirement.

Provisional licenses and other pathways

The current provisional-license rule, effective February 7, 2026, provides limited authority while an applicant completes licensing. Older applications still call it a Temporary Practice Permit. It is normally valid for 90 days or until examination results and cannot make its holder a contractor’s responsible electrician. The rule, forms and FAQ differ on some retry and timing details; the credential disclosures identify those differences. Confirm the authorization actually issued before working.

Out-of-state licensure may qualify for substantial-equivalency processing under the Board’s adopted list. It remains an application pathway, not a license or general permission to work in Montana. Directed reciprocity routes are reviewed separately. The Board also describes a distinct military-spouse provisional process while verification is pending; do not equate that process with the examination applicant’s provisional license.

Apprenticeship is a training and supervised-work pathway rather than another permanent license in this inventory. The statute excludes experience from an uncompleted apprenticeship from its definition of legally obtained practical experience, and apprenticeship hours do not count as journeyman-level experience. A Pioneer Electrician Certificate is honorary and does not authorize licensed work.

Exemptions are work-specific. Montana law addresses apprentices, certain utility work, owner work on a residence, low-energy circuits and other defined situations. Do not treat an exemption as a general electrical license or permission to perform other work; permits or inspections may still apply. Separate elevator and inspection programs are outside this electrical-license inventory.

Current rules and older forms

Two older-source conflicts are resolved by current rules: continuing education is 16 hours during the renewal cycle, including at least eight NEC-update hours, and Unlimited Electrical Contractors cover commercial, residential, industrial and institutional installations. Other discrepancies remain in the residential 4,000/8,000-hour checklist and the journeyman form’s residential-only wording. Use the current statute and rules while asking the Board to resolve application-processing questions.

The Board announced a 50% renewal-fee abatement for the May 15–July 15, 2026 renewal window. That window has closed; the standing fees in the credential disclosures are not a quote for a late renewal. Verify the amount due and any late charges through the current renewal process.

Before you apply

Review the official application forms, renewal instructions and license lookup. Confirm the qualification route, documents, examination, scope and any unresolved form discrepancy with the Montana State Electrical Board before applying.

View Application Information → License Lookup →

Cite this page
Title
Electrician Licensing in Montana
URL
https://tradesdir.com/electrical/licensing/montana
Information checked
2026-09-14

Suggested citation: Electrician Licensing in Montana. Trades Directory. https://tradesdir.com/electrical/licensing/montana (information checked 2026-09-14).

← All States